147 West 22nd Street - Our Re-Roofing Project -Completed

by Bulado Construction


We have recently completed our re-roofing project at 147 West 22nd Street in New York City. The project consisted of the following: 

  • Removed and disposed existing roof to structural deck
  • Repaired concrete roof deck
  • Installed new 25-year Siplast roof system
  • Roof deck re-modelling and installation
  • Cladding
  • Pointing
  • Brick replacement
  • Reglet installation
  • Caulking 
  • Lintel replacement

Below are some pictures of the completed project:


147 West 22nd Street New York - Completed Project

by Bulado Construction


We have recently completed our re-roofing project at 147 West 22nd Street, New York. This project consisted of the following work:

  • Removal and disposal of the existing roof to structural deck
  • Repair concrete roof deck
  • Installed new 25 year SIPLAST roof system
  • Re-modelling and installation of roof deck
  • Cladding
  • Pointing
  • Brick replacement
  • Reglet installation
  • Caulking
  • Lintel replacement

 

Below are some pictures of the completed roof deck:


147 West 22nd Street - Completed Project

by Bulado Construction


We recently completed our re-roofing project at 147 West 22nd Street in New York City. The project consisted of the following: 

  • Removed and disposed existing roof to structural deck
  • Repaired concrete roof deck
  • Installed new 25-year Siplast roof system
  • Roof deck re-modelling and installation
  • Cladding
  • Pointing
  • Brick replacement
  • Reglet installation
  • Caulking 
  • Lintel replacement

Below, please see some pictures of the completed roof deck:


1 University Place - Facade Repairs

by Bulado Construction


Below please find some pictures of our work in progress on the facade repairs at 1 University Place.

 

 


34-21 80th Street - Jackson Heights

by Bulado Construction


We recently began work at our project at 34-21 80th Street in Jackson Heights. The scaffolding and sidewalk bridge have been set up and the work has commenced on installing a waterproofing system on the interior of the gutter into the downspouts and window restorations around the building. Below are some picture of the progress:


242 East 72nd Street - Facade Restoration and Repairs

by Bulado Construction


242 East 72nd Street - Facade Restoration and Repairs

We are currently working on the terracotta repairs at 242 East 72nd Street. The repairs include installing stainless steel pins on epoxy, patching spalls on terracotta, and replacing damaged caulking on terracotta joints. Below are some pictures of the work in progress. 


35 East 84th Street - Update

by Bulado Construction


The exterior repairs at 35 East 84th Street are progressing as planned. We are currently working on the Local Law 11 repairs. The repairs include removing and resetting loose copings on balconies, installing stainless steel pins on damaged terracotta, repairing spalls on terracota, and cutting and repointing cracked mortar joints. 

35 East 84th Street - Facade Repairs

127 East 30th Street - Facade Project Completed

by Bulado Construction


Last week we completed our facade repair project at 127 East 30th Street, the project included:

  • Hammer test balcony deck, fascia and soffit surfaces
  • Repair fascia cracks and spalls
  • Repair balcony soffit cracks and spals
  • Repaint balcony deck, exterior fascia and soffits
  • Repointing bricks
  • Edge repairs
  • Structural slab repairs
  • Concrete coatings on repaired structural slabs

Below please find some pictures of the completed work:

Here you could also see some pictures of the work in progress:


147 West 22nd Street - Re-roofing and Roof Deck Installation

by Bulado Construction


Our re-roofing and roof deck project recently started at 147 West 22nd Street. The project includes the following:

  • Roof replacement, including a complete tear off 
  • Repair of concrete roof deck
  • Redress of all parapet and bulkhead walls
  • Painting of exterior railings
  • Buildout of common deck area
  • Parapet coping cover and cladding
  • Stairwell bulkhead cladding
  • Fabrication and installation of pergola, trellis and screening elements

Below are some pictures of the work in progress:


272-278 West 10th Street

by Bulado Construction


We recently finished our project at 272-278 West 10th Street. For this project we:

  1. Powerwashed all brownstone
  2. Patched cracks and loose areas as required
  3. Applied new coating over entire facade
  4. Full restoration of brownstone bands and base curb
  5. New coating over watertable

Below are some pictures of the building from before and after the project was done. Please let us know what you think in the comments below.


227 East 66th Street - Facade Restoration and Repairs

by Bulado Construction


We are currently working on a facade restoration and repairs project at 227 East 66th Street. The project involves brick replacement, repointing, stone lintel and sill repairs, as well as stitching of stone lintels and stone sills. The project has been progressing as planned - below you can see some pictures:


127 East 30th Street - Facade Repairs

by Bulado Construction


We recently begat the facade repairs at 127 East 30th Street, which include:

  • Hammer test balcony deck, fascia and soffit surfaces
  • Repair fascia cracks and spalls
  • Repair balcony soffit cracks and spals
  • Repaint balcony deck, exterior fascia and soffits
  • Repointing bricks
  • Edge repairs
  • Structural slab repairs
  • Concrete coatings on repaired structural slabs

60 Thomas Street - Masonry Restoration & Repairs

by Bulado Construction in


We recently started our masonry restoration and repairs job at 60 Thomas Street in TriBeCa. The project consists of the following:

  • Powerwashing and painting entire facade
  • Lintel repairs on front facade
  • Metal repairs on floor facings
  • Repainting diamond plate at building ramp
  • Pointing
  • Window refurbishment
  • Steel channel reinforcement
  • Limestone repairs
  • Repointing stone work
  • Roof, interior parapet, coping, and bulkhead repairs

So far, the project has progressed well and in a timely fashion. Below please see some pictures from the work at the project site.